Anchor Frame Collar For L68B2 Mast
- ZCJJ
- China
- 5 to 30days
- 50 to 200 pcs, sets
the Netherlands Tower Crane, Belgium Tower Crane,
Products Specification
Type , Model: Anchor Frame Collar For L68B2 Mast
Size: 2m for 2M L type mast
Materials: Q345B
Process: Blasting derusting,
Painting: Under painting , Middle painting, Surface painting.
Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.
Anchor Frame Collar For L68B2 Mast
Tower Crane Knowledge sharing:
the installation and maintenance technology of tower crane slewing support
Tower crane slewing support is an important tower crane accessories, tower crane slewing support installation and maintenance link in the process of tower crane installation and maintenance of many times will be ignored, the following tower crane slewing support installation and maintenance technology and we do a discussion.
Anchor Frame Collar For L68B2 Mast
(1) the mounting support of the slewing support must be rigid enough and the mounting surface must be smooth. Before the slewing support is assembled, the bearing should be de-stressed to reduce the deformation of the slewing support. The contact surface between the support and the slewing support must be cleaned during assembly.
(2) during the maintenance and use of tower cranes, attention should be paid to the change of noise and the change of rotary resistance moment.
(3) the slewing support must be hoisted or stored horizontally, but not vertically to avoid deformation.
Anchor Frame Collar For L68B2 Mast
(4) before the bolt is completely tightened, the meshing inspection of the gear shall be carried out, and the meshing condition shall meet the requirements of gear accuracy: that is, the contact spots distributed on the tooth surface of the gear pair
After running under slight braking shall be no less than 25% in the direction of gear tooth height and no less than 30% in the direction of gear tooth length; For 10 shifts of tooth surface work, debris shall be removed once and grease shall be re-applied.
(6) in order to ensure the reliability of bolt work and avoid the insufficient pre-tightening force of bolts, the pre-tightening torque of bolts should be checked respectively after the first 100 hours and 500 hours of rotary support work. After that, the pre-tightening torque should be checked every 1000 hours.
Anchor Frame Collar For L68B2 Mast
(7) the bolt and nut connecting the slewing support shall be high-strength bolt and nut of tower crane; Use double nuts to tighten and prevent loose.
(8) when tightening the nut, the thread of the bolt and the end face of the nut shall be lubricated, and the torque wrench shall be used to tighten the nut symmetrically and evenly in the circular direction for several times.
When tightening for the last time, the pre-tightening torque on each bolt should be roughly uniform.
(8) four oil cups are arranged on the upper surface of the gear ring of the slewing support and aligned with the raceway, so as to add grease to the raceway. In general, the slewing bearing is lubricated once every 50 hours. Add enough oil each time until the oil oozes from the seal.
Anchor Frame Collar For L68B2 Mast